How a full ocean export (FCL / LCL) moves — from quote and booking to pickup tracking, broken down step by step; a good first read before your first shipment.
One export shipment, from quote to container return, breaks into seven steps: quote & plan, booking & space release, pickup & loading, export customs, bill of lading & SI, charges & fees, and tracking & exceptions. Below we walk through what to prepare and where it usually goes wrong at each step.
1Quote & plan
2Booking & release
3Pickup & loading
4Export customs
5B/L & SI
6Sailing & transit
7Arrival & return
1. Quote & plan
At the quote stage, send whatever information you have — we'll ask for the rest one by one. The more complete it is, the faster and more accurate the quote.
Product name and English cargo description (used for both booking and customs)
Pieces, weight, volume, or the carton specifications
Container type and quantity, or the volume/tonnage for LCL
Origin and destination (port or delivery address)
Cargo-ready date — the day it can be loaded or delivered to the warehouse
Incoterm (EXW, FOB, CIF, DDP, etc.)
Whether you need trucking, customs, insurance, or destination clearance and delivery
We usually give two or more options: one that catches the next sailing, and one that's a bit cheaper but a voyage slower; charges are itemized across three legs (origin, ocean, destination) and quoted per shipment.
Quote inputs and plan comparison
2. Booking & space release
Booking reserves space with the carrier based on the cargo-ready date and cargo details. You send us the booking request (shipping order), we book with the carrier, and release the space to you once confirmed.
S/O number — the booking confirmation number
ETD (estimated departure), plus the transit and port calls
Cut-off times: customs release and the container gate-in deadline
B/L and SI cut-off: B/L details, VGM declaration, manifest, and AMS / ENS / AFR security filings
Free time, plus the earliest pickup and return times
Two points that are easily misunderstood: a released booking doesn't guarantee a container — condition and barcode are only known at pickup; and if the schedule changes, the last release message prevails, and we'll sync it to you.
Booking and space release flow
3. Pickup & loading
After the release, complete loading or warehouse delivery before the cut-off. Trucking is usually booked a day ahead, earlier in peak season; book heavy and twin-20ft moves as early as possible. Trucking covers all of China — send the pickup address, contact and loading requirements.
Check the container: no damage, holes or odor; photograph any dents first for the record
Weigh before and after loading; keep the weighbridge slips
Photograph for the record: empty container number, door nameplate, one-third, half, two-thirds, full, and the seal
For multi-shipper or multi-model loads, photograph each shipper and model separately
Palletize heavy cargo and precision instruments; account for the door height in the pallet height
Work out overweight before loading: check the door's maximum payload together with the transit and destination weight limits. If overweight is only discovered at the terminal after loading, the only option is to strip and unload. After loading, send us the gate-in data to arrange the container return.
Container check, photos and post-loading actions
4. Export customs
For ocean freight, declaration usually happens after the container is gated in, though some ports allow declaration before gate-in; for LCL it's after entering the bonded warehouse, and for air after entering the air cargo warehouse. All must be released before the cut-off.
Standard documents: packing list, invoice, contract, customs declaration, customs power of attorney, declaration elements
Special cargo may also need the commodity-inspection release, fumigation certificate, brand authorization, etc.
Process: e-authorization → enter the declaration system → check the draft → declare → customs review (cooperate if inspected) → release
If you don't have export rights, we can handle the declaration. Disclose sensitive details honestly before declaring — brands, batteries, liquids, powders — because mismatched data at inspection is far worse than submitting an extra document. After sailing the declaration is hard to amend, so keep the declaration, manifest and B/L consistent.
Export customs process and document list
5. Bill of lading & SI
Around sailing is the window for the SI and B/L confirmation — submit by the document cut-off on the release message.
Check the shipper, consignee and notify party
Check the English product name and HS code
Check the pieces, weight, dimensions, and the container and seal numbers
Confirm the release method: original, telex release or sea waybill
The VGM declaration, manifest and AMS / ENS / AFR filings all happen in this window. Once the B/L draft is out we send it to you to check — confirm it before sailing to avoid post-sailing amendments.
SI window and B/L release methods
6. Charges & fees
A shipment's charges fall into three legs: origin export charges (trucking, customs, terminal and document fees — mostly in CNY), the ocean leg (mostly settled in USD), and destination import charges (per the destination's current rates, usually borne by the consignee or per the incoterm).
We quote per shipment and itemize each leg; any extra charges — inspection, drop-off, extended container use — are flagged in advance with the reason, so you can reconcile with your customer.
Three-leg charges: origin, ocean, destination
7. Tracking & exceptions
After sailing we follow it to destination: for FCL watch the pickup and return (GATE OUT / GATE IN), for LCL whether it's been collected, for air whether pickup and clearance are complete. You can self-check on the Tracking page by B/L or container number, or just ask us.
Common destination extras: detention (container not returned on time), demurrage/storage (container not picked up on time); free-time calculation differs by carrier and is explained at booking
Rolled or delayed due to a full vessel: re-book the next sailing and sync the new schedule to you
Inspection: cooperate with documents, and watch the time and any costs
Consignee late to pick up or abandons cargo: notify immediately and make a risk plan together
We sync progress at each milestone, and notify you first on any exception before deciding how to handle it.
Tracking milestones and common exceptions
FAQ
Common questions
What do I need to prepare for a quote?
Send the product name, pieces/weight/dimensions or carton specs, container type and quantity, origin and destination, cargo-ready date and incoterm; we'll ask for anything missing.
How far ahead should I book?
Base it on the cargo-ready date and schedule; generally book 1–2 weeks before the cargo is ready. In peak season, for special equipment or a specific sailing, the earlier the better, per the carrier's current space.
Does a released booking mean I have a container?
No. A release confirms vessel allocation; whether a box is available and its condition is only known at pickup. For carriers that require barcode scanning before pickup, act as soon as the barcode opens.
Can cargo still make the vessel if customs release is late?
If the vessel hasn't sailed you can apply for a late release; whether it's accepted depends on the carrier and current schedule. If not, the only option is to re-book the next sailing.