Over-height, over-width, over-length or overweight cargo that won't fit a standard container — use Open Top (OT) or Flat Rack (FR). Special equipment is quoted per shipment; we build the plan around your cargo.
OOG (Out of Gauge) means cargo whose dimensions or weight fall outside the standard container range. In the narrow sense, special-equipment OOG mainly means two types: Open Top (OT) and Flat Rack (FR) — one opens from the top to solve "over-height, hard to load through the door" problems, the other removes the roof and sides to solve "over-width, over-length, overweight" problems.
Special equipment is the classic high-threshold, per-shipment business in freight forwarding: inventory is limited, specs vary widely by carrier, and lashing & bracing requirements are high. So special equipment has no fixed online price — we always "assess per shipment + quote per shipment" based on your cargo, which is exactly where planning capability shows.
Whether cargo fits comes down to container specs; whether it is safe comes down to weight limits. OT and FR are special equipment, so the dimensions below are industry reference values (approximate) — specs, weight limits and acceptance terms vary widely by carrier and unit batch and must be confirmed per shipment; each card links to the official container pages of Hapag-Lloyd, CMA CGM and COSCO Shipping.
Reefers (RF, temperature-controlled -25℃ to +25℃) and tank containers are also special equipment; demand is lower and they need per-shipment confirmation. If you need them, send the product name and temperature requirements for a separate assessment.
Also add origin, destination and cargo-ready date. Don't have it all? Send the dimensions, weight and photos first, and we'll ask for the rest one by one. For special equipment, inquire at least 2–3 weeks ahead.
Beyond the ocean freight itself (quoted per shipment, usually higher than standard), special equipment often incurs these charges, which we itemize in the quote:
Special cargo is usually crane-loaded at the warehouse, incurring loading and crane charges.
Secured per carrier requirements, possibly with bracing photos/proof; materials and labor are extra.
Open Top containers need waterproof tarpaulins to protect against rain and moisture.
At some ports special equipment has essentially no free storage period; storage may accrue before and after loading.
Over-height needs a low-bed trailer and overweight needs special trucking — pricier than standard trucking.
Special-equipment rates are quoted CASE BY CASE per shipment: each carrier's special-equipment lanes, box inventory, terminal plans, and your cargo's dimensions and weight all differ, and specs, weight limits and acceptance terms vary widely between carriers — so there's no fixed rate as with a standard container. We quote the current accurate price from your single-piece dimensions, weight, product name and route, and itemize the charges and risks.
Inquire and book at least 2–3 weeks ahead: special-equipment inventory is limited, some carriers must reposition empty units from another port, and once dimensions are submitted, changes require re-checking the freight and even the space. In peak season, book even earlier.
Mostly yes, but it depends on the exact dimensions. Open Top over-height is generally kept within 4 m (over-height needs a low-bed trailer); beyond 4 m, or over-width or overweight cargo, must be confirmed with the carrier and terminal per shipment. Send single-piece dimensions, weight and photos — we assess first, then choose the equipment and plan.
Usually higher. Special-equipment ocean freight is mostly quoted per shipment, and beyond the freight there are often logistics, warehouse-loading, tarpaulin, storage and drop-off charges, with stricter lashing & bracing requirements. But using the right equipment (e.g. Open Top instead of forcing a standard container) avoids the risk of not fitting, being rolled or getting damaged — cheaper overall in peace of mind.